‹ Back
River and Canal Engineering, the characteristics of open flowing streams, and the principles and methods to be followed in dealing with them.

Owning includes offline reading and never expires.

Science & Nature

River and Canal Engineering, the characteristics of open flowing streams, and the principles and methods to be followed in dealing with them.

Edward Skelton Bellasis

211 pages~4 hr 13 min read94 chapters$4.99
Or read everything with NaturaRead Plus · $6.99/mo
▷ Read a sample

Rivers do not run in straight lines, and taming them is an art. Bellasis explains the behavior of open flowing streams and the engineering that trains, banks, and channels them for navigation and control. A clear technical guide grounded in real waterworks. Understand how engineers bend a wild river to human use without breaking it.

Every copy includes a printable PDF edition, a beautifully typeset book you can print, mark up in the margins, and keep on your shelf. Yours the moment you own it.

Inside this book

94 chapters

  1. 1RIVER AND CANAL ENGINEERING
  2. 2RIVER AND CANAL ENGINEERING THE CHARACTERISTICS OF OPEN FLOWING STREAMS, AND THE PRINCIPLES AND METHODS TO BE FOLLOWED IN DEALING WITH THEM BY E. S. BELLASIS, M.Inst.C.E. RECENTLY SUPERINTENDING ENGINEER IN THE IRRIGATION BRANCH OF THE PUBLIC WORKS DEPARTMENT OF INDIA 72 ILLUSTRATIONS London E. F. N. SPON, Ltd., 57 HAYMARKET, S.W. New York SPON CHAMBERLAIN, 123 LIBERTY STREET 1913
  3. 3PREFACE
  4. 4RIVER AND CANAL ENGINEERING CHAPTER I INTRODUCTION
  5. 51. Preliminary Remarks.—River and Canal Engineering is that branch of engineering science which deals with the characteristics of streams flowing in open channels, and with the principles and methods which should be followed in dealing with, altering, and controlling them. It is not necessary to make a general distinction between natural and artificial streams; some irrigation canals or other artificial channels are as large as rivers and have many of the same characteristics. Any special remarks applicable to either class will be given as occasion requires. 2. Résumé of the Subject.—Chap. II. of this book deals with the collection of information concerning streams, a procedure which is necessary before any considerable work in connection with a stream can be undertaken, and often before it can even be decided whether or not it is to be undertaken. Chap. III. deals with rainfall, and describes how rainfall figures and statistics can be utilised by the engineer in dealing with streams.
  6. 63. Design and Execution of Works.—After obtaining full information concerning the stream to be dealt with, careful calculations are, in the case of any large and important work, made as to the effects which will be produced by it. These effects cannot always be exactly foreseen. Sometimes matters can be arranged so that the work can be stopped short at some stage without destroying the utility of the portion done, or so that the completed work can be altered to some extent.
  7. 74. The Hydraulics of Open Streams.—When any reach of a stream is altered, say by widening, narrowing, or deepening, so that the water-level is changed, there will also be a change in the water-level, a gradually diminishing change, for some distance upstream of the reach. Also in the lowest portion of the reach the change will gradually diminish and it will vanish at the extreme downstream end of the reach. In the next lowest reach there is no change. Thus if it is desired that the change in the water-level shall take full effect throughout the whole of a reach, the change in the channel must be carried further down. If a weir is built there is no change in the water-level downstream of it except such as may be due to loss of water in the reach upstream of it. The above points are mentioned here because, although they are really questions of hydraulics, they are of much importance and of very general application.
  8. 8CHAPTER II RAINFALL
  9. 91. Rainfall Statistics.—The mean annual rainfall varies very greatly according to the locality. In England it varies from about 20 inches at Hunstanton in Cambridgeshire, to about 200 inches at Seathwaite in Cumberland; in India, from 2 or 3 inches in parts of Scinde, to 450 inches or more at Cherrapunji in the Eastern Himalayas.
  10. 102. Available Rainfall.—The area drained by a stream is called its “catchment area” or “basin.” The available rainfall in a catchment area is the total fall less the quantity which is evaporated or absorbed by vegetation. The evaporation does not chiefly take place directly from the surface. Rain sinks a short distance into the ground, and is subsequently evaporated. The available rainfall does not all flow directly into the streams. Some sinks deep into the ground and forms springs, and these many months later augment the flow of the stream and maintain it in dry seasons. The available rainfall of a given catchment area is known as the “yield” of that area.
  11. 113. Measurement of Rainfall.—A rain-gauge should be in open ground and not sheltered by objects of any kind. The ordinary rain-gauge is a short cylinder. This is often connected by a tapering piece to a longer cylinder of smaller diameter. In this the rain is stored safely and is measured by a graduated rod. The measurement can be made more accurately than if the diameter was throughout the same as at the top. In other cases the water is poured out of the cylinder into a measuring vessel. If the rain-gauge was sunk so that the top was level with the ground, rain falling outside the gauge would splash into it and vitiate the readings unless the gauge was surrounded by a trench. Ordinarily the top of the gauge is from 1 to 3 feet above the ground. When it is 1 metre above the ground the rain registered is said to be on the average about 6 per cent. less than it should be, owing to the fact that wind causes eddies and currents and carries away drops which should have fallen into the gauge. The velocity of the wind increases with the height above the ground, and so does the error of the rain-gauge. Devices for getting rid of the eddies have been invented by Boernstein and Nipher (Ency. Brit., Tenth Edition, vol. xviii.), but they have not yet come into general use. The Boernstein device is being used experimentally at Eskdalemuir. It would appear that much splashing cannot take place when the ground is covered with grass, and that in such a case the top of the gauge could be 1 foot above the ground, thus making the error very small.
  12. 124. Influence of Forests and Vegetation.—When the ground is covered with vegetation, and especially forests, the humus or mould formed from leaves, etc., absorbs and retains moisture. It acts like a reservoir, so that the run-off takes place slowly and the denudation and erosion of the soil is checked. The roots of the trees or other vegetation also bind the soil together. Vegetation and forests thus mitigate the severity of floods and reduce the quantity of silt brought into the streams. They also shield the ground from the direct rays of the sun and so reduce evaporation, and thus, on the whole, augment the available rainfall. Forests render the climate more equable and tend to reduce the temperature, and they thus, at least on hills, increase the actual rainfall to some extent.
  13. 135. Heavy Falls in Short Periods.—When rain water, instead of being stored or utilised, has to be got rid of, it is of primary importance to estimate roughly—exact estimates are impossible—the greatest probable fall in a short time. This bears a rough ratio to the mean annual fall. The maximum observed falls in twenty-four hours range, in the United Kingdom, generally from ·05 to ·10 of the mean annual fall—but on one occasion the figure has been ·20,—and in the tropics from ·10 to ·25. Actual figures for particular places can be extracted from the rain registers, but the probability of their being exceeded must be taken into account. The greatest fall observed in twenty-four hours in the United Kingdom is 7 inches, and in India 30 inches in the Eastern Himalayas.
  14. 14CHAPTER III COLLECTION OF INFORMATION CONCERNING STREAMS
  15. 151. Preliminary Remarks.—The information which is required concerning streams depends on the character of the stream and on the nature of the work which is to be done. For the present let it be supposed that the stream is large and perennial. Other kinds of streams will be dealt with in Arts. 6 and 7. In dealing with a large perennial stream it is nearly always necessary to know the approximate highest and lowest water-levels, and these can generally be ascertained by local inquiry, combined with observations of water marks; but a higher level than the highest known and a lower level than the lowest known are always liable to occur, and must to some extent be allowed for. If navigation exists or is to be arranged for, the highest and lowest levels consistent with navigation must be ascertained. The highest such level depends chiefly on the heights of bridges. A plan to a fairly large scale is also necessary in most cases.
  16. 162. Stream Gauges.—Unless the stream being dealt with is an artificial one, it is unlikely that the flow in the reach with which the work is concerned will be uniform. The rise and fall of the water at one place cannot therefore be correctly inferred from those at another. It will be desirable to have two gauges, either read daily or else automatically, recording the water-level, one near each end of the reach concerned, with intermediate gauges if the reach is very long. If, in or near the reach, there is already a gauge which has been regularly read, it may be sufficient to set up only one new gauge, and to read it only for such a period of time as will give a good range of water-level, and to compare the readings with those of the old gauge. The readings of the new gauge for water-levels outside the range of those observed can then be inferred, but if the stream is very irregular this may involve some trouble (Art. 4).
  17. 173. Plan and Sections.—Making a survey and plan, and laying down on it the lines for longitudinal and cross-sections, and taking levels for the sections, are ordinary operations of surveying. If any land is liable to be flooded, its boundaries should be shown on the plan and on some of the cross-sections. Unless the water is shallow, it is necessary to obtain the bed levels from the water-level by soundings, the level of a peg at the water-level having been obtained by levelling. All the sections should show the water-level as it was at some particular time, but the water-level will probably have altered while the survey was in progress, and allowance must be made for this. The pegs at all the cross-sections and on both banks of the stream—for the water-levels at opposite banks may not be exactly the same—may, for instance, be driven down to the water-level when it is steady, and thereafter any changes in it noted and the soundings corrected accordingly.
  18. 184. Discharge Observations.—For a large stream it is necessary to observe the discharges by taking cross-sections and measuring the velocity. If there is a sufficient range of water-levels, it will be possible to make actual observations of a sufficient number of discharges. If soundings cannot, owing to the depth or velocity, be taken at high water, they must be inferred from those previously taken, but this does not allow for changes in the channel, which are sometimes considerable and rapid. If there is not a sufficient range of water-level, the discharges for some water-levels must be calculated from those at other water-levels. In this case observations of the surface slope will be required, and the discharge site should be so selected that no abrupt changes in the channel will come within the length over which the observations are to extend. This length should be such that the fall in the water surface will be great enough to admit of accurate observation. If the cross-section of the stream is nearly uniform throughout the whole of this length, or if it varies in a regular manner, being greatest at one end of the length and least at the other end. the differences in the areas of the two end sections being not more than 10 or 12 per cent., then the velocity and cross-section of the stream can be observed in the usual manner at the centre of the length; but otherwise they should be observed at intervals over the whole length, or at least in two places, one where the section is small and one where it is great, and the mean taken. Or the velocity can be observed at only one cross-section and calculated for the others by simple proportion and the mean taken. The coefficient C can then be found from the formula C = V/√(RS). To find the discharge for a higher or lower water-level, the change in the value of C corresponding to the change in R can be estimated by looking out the values of C in tables, and the discharge calculated by using the new values of C and R and the new sectional area, S remaining unaltered. But if the channel is such that, with the new water-level, a change in S is likely to have occurred, this change must be allowed for. Any such change will be due to the changed relative effects of irregularities, either in the length over which the observations extended or downstream of that length. The effect of irregularities in the bed is greatest at low water. The effect of lateral narrowings is greatest at high water. Since a change of 10 per cent. in S causes a change of only 5 per cent. in V, it will usually suffice to draw on the longitudinal section the actual water surface observed and to sketch the probable surface for the new water-level. If the whole channel is fairly regular for a long distance downstream of the discharge site, no slope observations need be made nor need several sections be taken in order to find V. The changed value of C should, however, be estimated in the manner above indicated. For this purpose any probable value of S will suffice. 5. Discharge Curves and Tables.—Ordinarily it will be possible, by plotting the observed discharges as ordinates, the gauge readings being the abscissæ, to draw a discharge curve and from it construct a discharge table. Unless the channel is of firm material and not liable to change, there are likely to be discrepancies among the observed discharges, so that a regular discharge curve will not pass through all the plotted points. If the discrepancies are not serious, they can be disregarded and the curve drawn so as to pass as near as possible to all the points, but otherwise trouble and uncertainty may arise. The soundings should be compared in order to see whether changes have occurred in the channel. If such changes do not account for the discrepancies, the cause must be sought for in some of the recorded velocities. If no sources of error in these can be found, such as wind, it is possible that the velocity has been affected by a change in the surface slope owing to some change in the channel downstream of the length. Failing this explanation, the discrepancies must be set down to unknown causes. With an unstable channel and where accuracy is required, the sectional areas and velocities should be regularly tabulated or plotted so that changes may be watched and investigated. To do this it may be necessary to take surface slope observations, or to set up extra gauges which will show any changes in the slope.

+ 76 more. The full contents open with the book.

More to explore

More in Science & Nature

See all
Every book, one price

Read it all with NaturaRead Plus

The whole catalogue for USD 6.99 per month. Or open all five apps with All-Access for USD 19.99 a month, or USD 149 a year.